Skip to content
Controlled Demolition in Tijuana: When It Is Justified
  1. Home
  2. Controlled Demolition in Tijuana: When It Is Justified

Controlled Demolition in Tijuana: When It Is Justified

Cheap demolition turns expensive the day it damages what was supposed to stay standing.

This guide is for anyone about to hire and wanting to understand what they are buying. If you are after the technical detail of the service, it is on the page for controlled demolition.

Conventional or controlled: how to decide

If the building is isolated, has no adjoining property and the site will be cleared, conventional machine demolition is faster and cheaper. Controlled demolition is justified when structure remains, when there are neighbours, live traffic, active services, or noise and vibration restrictions.

What makes demolition expensive

Access for machinery and cranes; height; proximity to property lines; the need for night windows; the volume and type of debris; and the presence of materials requiring special handling.

Before demolishing

Verify that the structure being demolished does not support one that remains, confirm services are disconnected, define the demolition sequence and lift plan, and cordon the drop zone. None of these steps is optional.

What to do with the debris

Clean concrete can be crushed and reused as base; mixed material goes to an authorised tip. The quote should state whether removal is included and to which disposal site.

Controlled Demolition
Clear on what you need? Request a quote and we will reply with method, schedule and price.
GPC Construcciones crew on site

Do you have concrete to cut?

Tell us what needs opening, drilling or demolishing. We reply with method, schedule and a clear price.